The Constructionarium Australia team are all making great use of the Envision software to manage their project which is resulting in comprehensive site reporting. They had another successful day today on site, and are on track for completion on time and under budget.

Joining in the fun on site today was Christine Knappstein and Bernhard Budiono to assist the cohort in keeping track of cost and schedule as they complete the flooring, handrails and section C of the 4 tonne Story Bridge Build. It has been a pleasure to work with this dedicated, committed and knowledgable group of students and early-career engineers, and we can see that construction, engineering and design is in very capable hands as the next generation of professionals make their mark on the industry.

We are looking forward to the final day of the programme tomorrow. Read more details about how they have progressed in today’s daily reports.

Download the day 2 Performance Report

Download the day 2 Site Report

Download the day 2 Cost Report